  • Fastest Graphite Analysis of treated metal in ductile iron
  • Take the coupen from every 2nd or 3rd mold wile pouring and flag the mold with green flag
  • 5 minutes before knockout, do the analysis with OIS V8. If fading is there, mark that box with red flag. OIS V8 will help you to avoid mixing of good castings and rejected castings at the time of knockout
  • One system can be used to two molding lines
  • OIS V8 will keep records along with Heat No. / Molding Line / Laddle & Box No. (additional display can be fixed on the shop floor)
  • All the communication is recorded for quality purpose